Energy Projects – List

Project Description
  • Pirinçli Weir and HEPP, Derya Elektrik Üretim A.Ş.
  • Alara Energy Project Feasibility Report, Borusan – EnBW Enerji Enerji Yatırımları ve Üretim A.Ş.
  • Alkumru Dam and HEPP Project
  • Alpaslan Dam and HEPP Project
  • Gürsöğüt Dam and HEPP Project – Gürsöğüt Enerji Üretim ve Tic. A.Ş.
  • Beşik Weir and HEPP Project – Paksu Enerji A.Ş.
  • Çermikler Dam and HEPP Project Site Control, Övünç Enerji A.Ş., Bank Consultancy
  • Karakeçili 2 HEPP Feasibility Report, Yaşam Energy A.Ş.
  • Dibekkaya Weir and HEPP Project Feasibility Report – Eyüp Cavlak Gıda Besicilik ve Electricity San. Tic. Ltd. Şti.
  • Sansa Weir and HEPP Project – Aksa energy Production A.Ş.
  • Aksu HEPP Final Project Technical Evaluation Report, FIRAT Müh. Müş. Ltd. Şti.
  • Akça HEPP Project Revised Feasibility Report – Yaşam Enerji Elektrik Üretim Ltd. Şti.
  • Aydoğan Pump – Turbine HEPP System Project Feasibility Report
  • Çileklitepe Dam and Avluca HEPP Project Revised Feasibility Report – Ekasu Mühendislik Müşavirlik Ltd. Şti. and İdil İki Enerji San and Tic. A.Ş.
  • Beşik Weir and HEPP Project – Paksu Enerji A.Ş,
  • Geldibuldu Weir and HEPP Project Revised Feasibility Report – Paksu Enerji A.Ş.
  • Kaplan Weir and HEPP Project Feasibility Report – Limgaz Elektrik Üretim Mad. San. ve Ticaret A.Ş.
  • Baykan Energy Group Project, Delen Enerji Üretim ve Tic. Ltd. Şti.
  • Gökay Hydroelectric Power Project Revised Feasibility Justification Report – Aras Enerji Üretimi Sanayi ve Ticaret A.Ş.
  • Yaprak Weir and HEPP Project Revised Feasibility Report – Albe Enerji Elektrik – Elektronik Danışmanlık Müşavirlik A.Ş.
  • Yumrukaya Weir and HEPP Project – Aras Enerji Üretimi San. and Tic. A.Ş.
  • Kaya Dam and HEPP – Ceykar Elektrik Üretim A.Ş.
  • Fındık Weir and HEPP Project – Lider Enerji